I have made quite a lot of progress these past few weeks, (mostly why I haven’t been posting too often) and I have pictures to show.
First thing I did was stiffen up the floor with 3/4″ plywood where the Shower and tub are to be installed.
I had to lower the ceiling over the tub and shower to incorporate the star field that I created in and earlier post. I dropped the ceiling by 4″ and recessed the star field about an inch to help it stand out a little. I also lowered the shower column where the rain head will go another 1 1/2″ which will later be tiled.

Rough in for shower valves also framing for shower which extends onto the roof for a rain shower head.
In this picture you can see my attempts at dampening the sound from the blower motor, I have place one inch foam on the floor, insulation around the tub and am using sound proofing insulation in the tub frame. Hopefully that will do something, at least I can say I tried.
So That about sums up to where I am at now. It is a slow process, mostly because I’m only working on it a couple of hours at a time after work but also because I really don’t know what I am doing most of the time and am just winging it, but lets keep that a secret.
If you have any questions or comments please post them below.